Georgetown shed permits
Georgetown shed permit and official survey guide
Georgetown requires a permit and an official site survey showing property lines and the proposed accessory-building location with dimensions.
Open Georgetown’s shed requirementsPreliminary guidance only. Verify the current package for your address before filing.

Official site survey required
The city does not publish a small-shed permit exemption on this page. An accessory building over 200 square feet also needs an engineered foundation plan.
The local drawing requirement
A preliminary site plan is not the required survey
Use the official survey from your closing documents or title company. The city asks for that document, not an aerial-derived property drawing.
Before you file
- Obtain the official site survey.
- Mark the proposed building location and dimensions.
- Add an engineered foundation plan when the shed exceeds 200 square feet.
- Follow the city’s accessory-building setbacks and permit process.
Product fit
Use the official survey and an engineer when required
EasySitePlan cannot replace Georgetown’s official survey or an engineered foundation plan. Start with the city checklist and your closing documents.
The boundary
EasySitePlan does not certify boundaries, replace a required survey, provide engineering, submit the permit, or guarantee approval.
Georgetown shed questions
Verify the rule before you draw
Does Georgetown require a shed permit?
Georgetown requires a permit and an official site survey showing property lines and the proposed accessory-building location with dimensions.
Is there a Georgetown shed permit exemption?
The city does not publish a small-shed permit exemption on this page. An accessory building over 200 square feet also needs an engineered foundation plan.
What should the Georgetown shed plan show?
Use the official survey from your closing documents or title company. The city asks for that document, not an aerial-derived property drawing.
Can EasySitePlan replace a survey for this Georgetown project?
EasySitePlan cannot replace Georgetown’s official survey or an engineered foundation plan. Start with the city checklist and your closing documents.
Where should I verify the current Georgetown requirement?
Use City of Georgetown accessory building permits, linked on this page, and confirm address-specific conditions with the reviewing office before filing.